SL Steam Locomotive - SY19 C57 Soyo Line - Thank you for your service
1973 C57 87, Soya Main Line ⑮, Asahikawa Station - Thank you for everything
[C57 87 History]
1939-02: Newly built by Hitachi, Ltd. Kasado Works. Assigned to Nagoya Bureau, stationed at Hamamatsu Depot.
1940-03: Hamamatsu Depot → Nagoya Depot → Shizuoka Depot → Takasaki Depot → Oku Depot → Fukuchiyama Depot
1961-04: Fukuchiyama Depot - Heavy oil co-firing equipment installed.
1972-03: Fukuchiyama Depot → Naebo Depot
1973-08: Naebo Depot → Asahikawa Depot
1975-03: Free loan agreement between the Director of Kagoshima Railway Bureau and the Mayor of Nakijin Village, Okinawa Prefecture.
1975-03: Scrapped (Asahikawa Depot)
1975-06: Opened as Okinawa Resort Station in Nakijin Village.
1982-04: SL Hotel closed, maintained and continued to be preserved at Nakijin Village General Athletic Park.
2005-05: Dismantled due to deterioration and corrosion caused by administrative indifference and lack of budget.
A4 size photo, framed.
Height: 31.5 cm, Width: 23.0 cm. Wall-mounted / Stand type.
Self-taken artwork.
#Photo
#Steam Locomotive
#SL
#C57
#SoyaMainLine
#Asahikawa
CategoryArt Of ArtConditionNew/unusedShippingIncluded in price (by seller)FromKanagawa
SHIPPINGS
Free shipping in Spanish mainland, Balearic Islands and Portugal.
For other countries the shipping cost will be paid by the client.
DELIVERY TIME (as of delivery)
Spanish mainland, Balearic Islands and Portugal: 1-2 working days.
Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.
The return period is 14 calendar days from the receipt of the order.
Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.